A high-voltage, oil transformer and its components were accepted for transportation. During the transportation, dry-freight vessel DW2000t was used, the unloading at the port of arrival Vladivostok was carried out by floating crane with a load-carrying capacity of 200 tons, further transportation was carried out by rail (specialized flat car "eight-axle transporter" and four gondola cars for components).The transformer was fixed to the flat car with metal protector and metal brackets, the welded structure made the freight transported under its own weight, and the welded brackets prevented the transformer from horizontal shift.

About the project in numbers

8
Length (m)
3,38
Width (m)
4.07
Height (m)
105
Weight (t)